Linkedin-in X-twitter Instagram
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Conferences & Exhibitions
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Conferences & Exhibitions
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms

NEWS

  • 14 January, 2026

Howick: Doing It Right The First Time

‘Waste not’. Nick coubray, CEO of Howick Ltd, outlines how Roll-forming innovation can help the construction and offsite sectors build better and be more efficient.

The construction industry has always accepted waste as a cost of doing business. Materials ordered ‘just in case’, offcuts filling skips, and site delays caused by late changes. It all quickly adds up. But with thorough planning, smarter digital design and precision roll-forming systems, this no longer needs to be the case.

At Howick, we see waste for what it is – lost time, lost profit, and lost opportunity. Waste is everywhere in construction, but most of it is preventable when precision and planning lead the process. For nearly 50 years, we have pioneered rollforming technology to help streamline construction. Steel components are formed from digital models, precut, punched, and labelled to exact specifications for faster assembly onsite or offsite.

Smarter systems reducing waste

For internal framing projects, the onsite flexibility provided by our telescopic panels markedly reduce time and waste. These telescopic panels, manufactured by our X-TENDA™ 3600 were used in the £130million refurbishment of One Queen Street in Auckland, New Zealand, which included a 5-Star hotel, 14,000m2 of prime office space, and a breathtaking rooftop bar. The telescopic panels contributed to a 50% reduction in the embodied carbon footprint compared with an equivalent newbuild. The installation of the framing was 60% quicker than planned for traditional stud and track.

Creating repeatable complexity

Roll-forming technology allows for the precision required to build expressive, complex forms with no re-work or waste, saving labour and time. For the Lucas Museum in Los Angeles, STUD-IO used Howick roll-forming machines to realise the mind-bending roof ribbon. Each of the 195 unique panels was pre-punched and shaped to follow the architect’s 3D model, then placed using a digitally fabricated rail and a robotic layout. The result was a repeatable approach to complex geometry, and a roof structure completed six months ahead of schedule.

Precision at every scale

From internal framing to large-span structures, the same roll-forming precision helps reduce waste at every scale. At British Offsite in Essex, Howick machines power their UNisystem – producing insulated wall panels that combine multiple trades into one ready-to-install product, cutting waste and rework. The same principle drives X-CALIBR™, a roll-formed structural system that makes light gauge steel structures possible where they once required heavy steel fabrication. Back in New Zealand, Howick’s sister company Central Steel Framing has used this system to erect a 650m2 honey storage shed in a single day without cutting or welding, or the associated waste.

Turn traditional waste into future opportunity

Whether simplifying modular production or enabling architectural freedom, roll-forming technology makes smarter construction possible. By moving more of the build into controlled factory environments, we reduce waste, risk, and carbon, while expanding what is achievable.

Read full article here.

Post Views: 10

To supply a story email [email protected]

SHARE

RELATED TOPICS

NEWS YOU MIGHT BE INTERESTED IN…

Enhancing 3D Volumetric Modular Design

August 6, 2026

Fire Safety and Membrane Specifications: why performance matters

June 8, 2026

Closing the Knowledge Gap – Detailed testing of party wall/SFS wall junctions

June 3, 2026

Zehnder launches EVO for seamless MVHR install in tight spaces

April 29, 2026

The Importance Of Early Engagement

April 2, 2026

Advancing Offsite in UK & Ireland

March 31, 2026

LATEST NEWS

Explore Offsite 2026 Speaker Programme Now Live
August 21, 2026
Wernick Hire launches RestPod to tackle workforce accommodation challenges on remote projects
August 20, 2026
Understanding How Frameworks Operate
August 19, 2026
MMC Specialist Mansell Building Solutions Prepares for Administration
August 19, 2026
The Cost-Effective Route to Net Zero
August 18, 2026
No posts found

LATEST ISSUE

VIDEO VAULT

CLICK HERE TO READ THE LATEST ISSUE
  • NEWS ROOM
  • SUPPLIER DIRECTORY
  • EVENTS
  • OFFSITE INFORMATION
  • ABOUT US
  • PRIVACY
  • HUB OPPORTUNITIES
  • OFFSITE MAGAZINE
  • BACK ISSUES
  • SUPPLEMENTS
  • ADVERTISE
  • SUBSCRIPTION

SIGN UP FOR OUR

LATEST NEWSLETTER

SUBSCRIBE TO OUR

OFFSITE MAGAZINE

Get in touch

  • T: 01743 290001
  • E: [email protected]

© OFFSITE HUB 2026 - All Rights Reserved