Vision Built is a leading offsite construction specialist delivering modular and panelised building solutions across Ireland and the UK. It designs, manufactures and installs light-gauge steel systems supporting faster, high-quality project delivery for public and private sector clients.
Vision Built is an Irish offsite construction specialist providing light-gauge steel panelised and volumetric modular building systems for projects across Ireland and the UK, operating as part of the Sisk group since its acquisition by John Sisk & Son in 2019.
Focused on modern methods of construction (MMC), the company delivers 3D Category 1 volumetric modular buildings and 2D Category 2 panelised systems that are manufactured in controlled factory conditions and rapidly assembled on-site, enhancing programme certainty, quality control, safety while reducing disruption on live sites.
From its 100,000sq ft ISO-certified facility in Tubbercurry, Co. Sligo, Vision Built produces light gauge steel frames and components that are supplied to projects throughout the Republic of Ireland and the UK, supported by offices in Galway and Hertfordshire to serve local client needs. Its systems are designed and tested to meet building regulations, BCAR, NSAI Agrement and BOPAS requirements, including robust fire testing, reinforcing its position as a long-term offsite solutions provider for low-to-medium rise, multi-occupancy buildings up to six storeys.
Since its establishment in 2012, the company has expanded beyond its original residential and commercial focus to deliver projects across education, healthcare, life sciences, hospitality, transport, and technology sectors, covering typologies such as commercial developments, hotels, residential schemes, hospitals, pharmaceutical facilities, and schools. Vision Built’s solutions are widely used for apartments, student housing, and social housing programmes, where offsite manufacture and rapid onsite assembly help clients meet demanding delivery and occupancy timelines.
A key aspect of Vision Built’s offer is its ability to act as a turnkey partner on volumetric modular projects, providing an integrated service encompassing design, manufacture, installation, and handover. This approach has been proven on large-scale programmes such as rapid-build social housing bundles for Dublin local authorities, where 2D light gauge steel panelised systems enabled delivery of hundreds of units across multiple sites within compressed timeframes, including factory periods as short as four weeks and on-site installation of approximately nine to ten weeks.
Environmental, Social and Governance (ESG) priorities are embedded in Vision Built’s strategy, aligned with Sisk’s wider group commitments to sustainability and responsible construction. By moving a significant proportion of activity into the factory, the company seeks to reduce waste, optimise material use, and improve health and safety, while collaborating closely with designers and contractors to standardise core designs and customise layouts and finishes to suit specific project requirements, balancing manufacturing efficiency with architectural intent.







