As a leading provider of modular building solutions in the UK, Wernick Buildings offers many innovative and sustainable construction options across various sectors, with healthcare now a vital area of development.
Over the past twelve months, Wernick Buildings has delivered a variety of different projects, from fully functional hospital wards and theatres to staff accommodation. However, they are proud to showcase the successful completion of the executive offices at Southmead Hospital. This project demonstrates excellence in efficiency and innovation with a sustainable approach to construction over traditional building techniques.
Situated within the Southmead Hospital estate in North Bristol, the executive offices stand as a testament to the seamless integration of modular construction methods with the stringent requirements of a healthcare environment. The project, a collaboration between Wernick Buildings and the hospital, aimed to provide modern executive office facilities that meet the highest standards of functionality and comfort to create an environment that fosters productivity for all occupants.
The objective of this project was to create additional office accommodation to alleviate space constraints on the main site, thereby facilitating the conversion of the vacated area into a much-needed clinical space. The newly constructed building serves as the base for executives and support staff, with the first floor dedicated to the executive team.
Rakesh Sandhu, Sales Director of Wernick Buildings, says: “Leveraging Wernick’s expertise in modular construction, the project achieved remarkable success in meeting the objectives required by the healthcare estate. This is now the second building provided by Wernick at the Southmead facility and we are thrilled to be able to provide yet another office building.” Additionally, Wernick Buildings are proud to announce that the Southmead offices won this year’s MMC award, for the Healthcare Project of the Year Award.
A more sustainable approach to construction
One of the key highlights of the project is its emphasis on sustainability. By employing offsite construction methods, Wernick minimised waste, reduced carbon emissions, and optimised resource utilisation, aligning with Southmead Hospital’s commitment to their environmental roadmap.
The nature of modular construction allowed for rapid assembly and installation, ensuring minimal disruption to hospital operations. By building modules in their manufacturing facility in South Wales, it ensured very little disturbance onsite. The collaborative working methods employed throughout the project underscored the commitment of both Wernick Buildings and Southmead Hospital to deliver excellence.
With the completion of the Southmead Executive Offices project, Wernick Buildings reaffirms its position as a trusted partner in delivering bespoke modular building solutions that exceed client expectations. Martin Crandon, Head of Capital Projects said: “We are delighted with the welcoming, light and open interior environment, which has exceeded our expectations. Comments from staff have all been very positive.”
More than just a box
Modular buildings are constructed in a controlled factory environment, adhering to strict quality control measures. This results in consistently high construction standards and superior craftsmanship. Additionally, the factory settings allow for meticulous attention to detail and greater accuracy during the building process. By employing these prefabricated structures, guarantees long-lasting and durable buildings to future-proof any project.
When considering a modular office building, it’s a common misperception to draw certain assumptions. You might conclude the idea that a modular building is ‘just a box’. However, modular construction offers the versatility to embrace contemporary, customised designs that enhance your workspace, aligning it with your specific requirements.
This year marks a significant milestone for Wernick as they celebrate their 90th anniversary in business, a testament to their enduring commitment to deliver successful projects.
For more information visit: www.wernick.co.uk/buildings
Image: Southmead Hospital Estate, North Bristol
Offsite Expo returns for 2024, visit www.offsite-expo.co.uk for more information!







