Linkedin-in X-twitter Instagram
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms

PROJECTS

Haringey – Volumetric™

SECTOR

Residential

CONTRACTOR

Volumetric™

TECHNOLOGY

Volumetric modular

LOCATION

Haringey

haringeyhasbecomethefirstcouncilinlondontoprovidethecustomdesignedmodulhaussolutiontotacklehomelessness

Project Overview:

Manufactured in nine weeks and installed in five days, we supplied 33 ModulHaus™ homes to Haringey Council in a pioneering project to help mitigate the housing crisis. The fully-outfitted modular homes, built to exceptional standards, provide interim housing to people experiencing homelessness. Robust testing, stringent product development, and offsite manufacture resulted in a cost-effective, sustainable build exceeding Future Homes Standard, providing outstanding performance and efficiency.

As part of a pioneering initiative to provide housing to people experiencing homelessness, Volumetric™, bespoke manufacturers of modular housing solutions, manufactured and supplied 33 single-occupancy modular homes to Haringey Council, London, in collaboration with delivery partners Hill Group. Designed to combat the growing housing crisis, our modular homes are stringently tested and manufactured in advanced offsite facilities to ensure optimum performance. The modules were constructed offsite to exceed the Future Homes Standard requirements and are BOPAS Accredited and LABC Assured with a 60-year design life.

We were able to deliver the project in just nine weeks, with installation taking five days with minimal groundwork and disruption to the site – an abandoned garage site in a densely populated residential area. The first development of its kind to be delivered over two storeys, the ModulHaus™ is fabricated from hot rolled steel point loaded corner post frames to allow interlockable stacking. Fire safety and performance were of utmost importance, with walls lined with fire-rated A1 non-combustible board. We utilised high quality internally fitted features for optimal energy and cost efficiency throughout the unit lifespan.

Including low energy lighting, white goods, controlled flow showers, and dual-flush cisterns to mitigate water waste. Well-insulated structures provide exceptional airtightness with U-values as low as 0.09W/m2k. The fully furnished, ready for occupancy homes have energy costs of around £5 per week, making them a viable housing solution for those without income. Over 95% of the solution is designed to be recyclable and recoverable, making it a flexible asset. Working with Haringey Council, Volumetric™ was able to meet site design specifications, including bespoke elements such as connections to align external stairs and walkways.

The homes were installed on disused council owned land, and our team worked collaboratively with the council to ensure maximum use of space. Offsite technology reduced time onsite, leading to significantly improved safety during installation, less site waste, and reduced delivery traffic. Six energy centres manufactured by Volumetric™ provide MEP services for the site via a ‘plug and play’ pipe work solution.

SHARE

PROJECTS YOU MIGHT BE INTERESTED IN…

Intrastack Ennerdale Avenue

October 7, 2024

British Offsite Abbey Quay, Barking, Weston Homes

October 7, 2024

Langley Square, Mill Pond, Dartford

September 11, 2024

LATEST NEWS

Cross Europe Challenges

September 17, 2026

Algeco Announce Head of Quality UK

September 17, 2026
Discussion surrounded the role of the architect as part of the industrialised construction process

Architecture’s Manufacturing-led Future

September 16, 2026

Swarm Robots for Modular Build Trial

September 16, 2026

Portakabin Delivers New MIC in North Yorkshire

September 15, 2026

CLICK HERE TO READ THE LATEST ISSUE

  • NEWS ROOM
  • SUPPLIER DIRECTORY
  • EVENTS
  • OFFSITE INFORMATION
  • ABOUT US
  • PRIVACY
  • HUB OPPORTUNITIES
  • OFFSITE MAGAZINE
  • BACK ISSUES
  • SUPPLEMENTS
  • ADVERTISE
  • SUBSCRIPTION

SIGN UP FOR OUR

LATEST NEWSLETTER

SUBSCRIBE TO OUR

OFFSITE MAGAZINE

Get in touch

  • T: 01743 290001
  • E: [email protected]

© OFFSITE HUB 2026 - All Rights Reserved