Linkedin-in X-twitter Instagram
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms

PROJECTS

Gaetana Residential Development – Aedas Homes

SECTOR

Residential

CONTRACTOR

Aedas Homes

TECHNOLOGY

Volumetric modular

LOCATION

Madrid

_dsc2599gaetanaexterior-min
gaetana
gaetana2

Project Overview:

Gaetana, an architecturally-stunning, 11-unit single-family offsite development near Madrid, features open-plan living spaces designed for comfort and functionality and high-quality, minimalist finishes that appeal to discerning home buyers. By employing 3D volumetric precast concrete modular technology, AEDAS Homes, a leading homebuilder in Spain, has delivered this factory-built development much faster than traditionally-built similar developments, with no cost deviation.

AEDAS Homes, one of Spain’s leading listed homebuilders with headquarters in Madrid, presents Gaetana for consideration for the International Offsite Project of the Year. Gaetana is a high-end, fully modular development in Torrejón de Ardoz, located 20 minutes east of Madrid. It is Phase One of a five-phase, 53-unit offsite development. The development, which was delivered to customers starting in late 2021, is comprised of 11 contemporary single-family terraced homes, with a total of 66 3D volumetric precast concrete modules.

Designed by Ortiz León Architects, a noted Spanish architecture firm with a strong interest in industrialised construction, the development features below-ground parking with EV charging, private pools and gardens, and adheres to strict energy efficiency specifications, with an “A” rating. The total GDV for the project is €5.04  million, with an average selling price of €458K per unit.

Strategic partnership

For the fabrication of the modules, AEDAS Homes formed a strategic alliance with Homm, an experienced manufacturer well-versed in DfMA technologies with decades of experience producing prefab concrete transformer substations.

To date, Homm has produced 5 developments (73 units) for AEDAS Homes, with 4 more (104 units) in the pipeline. The 66 modules that comprise Gaetana were produced and fitted out at Homm’s purpose-built facility in Toledo, then delivered to the site.

Floorplan and façade

Each unit in Gaetana is comprised of 6 precast concrete modules (installed above-ground) and has an avg floor area of 223 sqm on 3 levels (basement, ground floor and first floor). The spacious family homes are designed around an open-plan concept, with 4 bedrooms and 3 full bathrooms. The homes have architectural concrete facades, designed in consultation with Homm and optimised for quality and durability, as well for reducing materials and labour costs.

Timeframe

Module production began shortly after below-ground works commenced. It took 3 months to manufacture all 66 modules (5.5 modules per week). Then the 66 modules were craned into place over a 3-month period while below-ground works continued. Above-ground urbanisation works, finishing works on internal fitting out and MEP testing took additional time. Total build and installation time was 11 months, from breaking ground in Dec 2020 to final works reception in Nov 2021. Delivery started in Dec  2021.

SHARE

PROJECTS YOU MIGHT BE INTERESTED IN…

Intrastack Ennerdale Avenue

October 7, 2024

British Offsite Abbey Quay, Barking, Weston Homes

October 7, 2024

Langley Square, Mill Pond, Dartford

September 11, 2024

LATEST NEWS

Cross Europe Challenges

September 17, 2026

Algeco Announce Head of Quality UK

September 17, 2026
Discussion surrounded the role of the architect as part of the industrialised construction process

Architecture’s Manufacturing-led Future

September 16, 2026

Swarm Robots for Modular Build Trial

September 16, 2026

Portakabin Delivers New MIC in North Yorkshire

September 15, 2026

CLICK HERE TO READ THE LATEST ISSUE

  • NEWS ROOM
  • SUPPLIER DIRECTORY
  • EVENTS
  • OFFSITE INFORMATION
  • ABOUT US
  • PRIVACY
  • HUB OPPORTUNITIES
  • OFFSITE MAGAZINE
  • BACK ISSUES
  • SUPPLEMENTS
  • ADVERTISE
  • SUBSCRIPTION

SIGN UP FOR OUR

LATEST NEWSLETTER

SUBSCRIBE TO OUR

OFFSITE MAGAZINE

Get in touch

  • T: 01743 290001
  • E: [email protected]

© OFFSITE HUB 2026 - All Rights Reserved