Linkedin-in X-twitter Instagram
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms

PROJECTS

Critical Cooling DFMA Distribution System – Alternative Heat

SECTOR

Commercial

CONTRACTOR

Alternative Heat

TECHNOLOGY

Components

buffermodulefabrication1
alternative heat
alternative heat2

Project Overview

This project involved the development of a new build data centre with a rapid and rigid programme duration, on a compact site, within an established urban area and with restricted access and site compound/storage capacity. Client engagement led to design development focused on the following key objectives:

– Maximise scope of works  removed from site, minimising on-site works requirement, simplifying onsite HSEQ, and aiding on-site ability to comply with local Covid-19 guidance

– Condense design & build programme for off-site works reducing overall programme

– Optimise product design, layout, and component selection to streamline ongoing maintenance, extend product life span and minimise potential for terminal failures and requirement for system shutdown

Early-stage design involvement in redesign to accommodate prefabrication and thus maximise scope. Based on these objectives, in-house design and R&D teams reviewed existing specifications, operation philosophies, and BIM model, identifying and analysing potential areas for improvement, to ascertain viability in line with project programme and budget and where applicable, developing design solutions, all shared via a common data environment, enabling real time client review, dramatically reducing potential for delay and communication errors.

The finalised scope consisted of design, prefabrication, delivery and install of 7No. MEP rooftop cooling strings, 21No. buffer & pipework skid modules, 4No. modular plantrooms, rooftop ring main distribution pipework and installation of 7No. risers and lateral distribution across 3 data hall floors. Standardised DFMA design allowed for synergies in design and procurement and facilitated repetitive production line build methods which greatly shortened programme duration, increased cost certainty, and provided a consistent high quality of build and finish.

Fully Galvanized Structural frame with full operational loading structural calculations to ensure even weight distribution on rooftop mounts, weather tolerances, and development of integrated lifting points. Extensive QA, FAT testing and full offsite precommissioning and simulated operational testing enabled extensive trials to be conducted prior to despatch, proving operational capacity, and identifying potential weaknesses to be addressed before despatch to site. This ensured all units were despatched 100% defect free with optimum operational standards, removing need for on-site making good ‘snagging works, and minimising on-site installation and commissioning works. This client has subsequently appointed AH to identify, develop and deliver wider prefab packages for 2No. further new build data centres as a direct result of performance and  outcomes on this project.

SHARE

PROJECTS YOU MIGHT BE INTERESTED IN…

Intrastack Ennerdale Avenue

October 7, 2024

British Offsite Abbey Quay, Barking, Weston Homes

October 7, 2024

Langley Square, Mill Pond, Dartford

September 11, 2024

LATEST NEWS

Cross Europe Challenges

September 17, 2026

Algeco Announce Head of Quality UK

September 17, 2026
Discussion surrounded the role of the architect as part of the industrialised construction process

Architecture’s Manufacturing-led Future

September 16, 2026

Swarm Robots for Modular Build Trial

September 16, 2026

Portakabin Delivers New MIC in North Yorkshire

September 15, 2026

CLICK HERE TO READ THE LATEST ISSUE

  • NEWS ROOM
  • SUPPLIER DIRECTORY
  • EVENTS
  • OFFSITE INFORMATION
  • ABOUT US
  • PRIVACY
  • HUB OPPORTUNITIES
  • OFFSITE MAGAZINE
  • BACK ISSUES
  • SUPPLEMENTS
  • ADVERTISE
  • SUBSCRIPTION

SIGN UP FOR OUR

LATEST NEWSLETTER

SUBSCRIBE TO OUR

OFFSITE MAGAZINE

Get in touch

  • T: 01743 290001
  • E: [email protected]

© OFFSITE HUB 2026 - All Rights Reserved