Linkedin-in X-twitter Instagram
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms

NEWS

  • 15 April, 2024

Project profile: Concord Street, Leeds

Frameclad was appointed by the main contractor SJM to provide innovative light steel framing solutions for a challenging nine-storey development in Concord Street, Leeds. The contemporary new build scheme located in the city centre, comprises 35 studio, one and two-bedroom residential apartments. Utilising innovative techniques, Frameclad navigated the complex site and met all project requirements.

Why Light Steel Frame?

The main advantage of using light steel framing is its strength. The metal components are designed to be extremely tough and stable, meaning they can withstand high loads. Furthermore, because the frame assembles quickly and easily on site, it reduces labour costs significantly. As a result, light steel frames offer greater economic benefits than conventional building materials.

These structures require fewer resources to build and maintain, whilst also providing greater durability over time. The longer lifespan of light steel systems results in lower long-term costs associated with upkeep and repair. According to the Steel Construction Institute (SCI) design life predictions for light steel framing in a ‘warm frame’ environment are in excess of 250 years.

Resolving the Challenges

Situated in a well-connected central location, the site provided significant challenges, not least due to narrow off street access, meaning that on site construction works had to be minimised. The Frameclad team with their great technical know-how, collaborated with the contractor and architect to overcome these issues and meet the specific needs of the project.

Maximising state of the art digital and offsite technology the specialist team designed, engineered and manufactured an advanced loadbearing steel frame solution using a full building information modelling (BIM) approach with customised Tekla software.

Using design for manufacture and assembly (DfMA) protocols, Frameclad’s loadbearing frames provided multiple benefits to the project, resulting in faster assembly, enhanced sustainability and significantly reducing construction time, enabling site restrictions to be overcome and project deadlines to be met.

Using a platform approach, the specialised flooring system delivered a working platform to facilitate the construction of further storeys, ensuring constant site safety throughout the build. With Frameclad’s extensive expertise and tenacious approach to fulfilling client requirements, the resulting development was finished on time, on budget and to a high quality.

  • Project: Concord Street, Leeds
  • Main contractor: SJM
  • Floors: nine storeys
  • Products: Loadbearing steel framing system assembled and boarded

 

Lattice joist floors with metal decking

Roofing steel framing system

For more information on Frameclad’s project portfolio, go to: www.frameclad.com/case-studies

Views: 181

To supply a story email [email protected]

SHARE

RELATED TOPICS

NEWS YOU MIGHT BE INTERESTED IN…

The new CPD covers fire rated wall breather membranes used within external façade systems and air and vapour control layers

New CPD on Fire Rated Membranes for Building Safety

October 9, 2026

Ergodek® – A New Era of Safe, Efficient and Innovative Metal Deck Fastening

October 2, 2026

Euroform’s Latest Structural Floor Panel

September 2, 2026

MEP: Hidden in Plain Sight

August 27, 2026

The Vital Role of Insulation in MMC

August 27, 2026

MVHR Installation Doesn’t Have to Be a Game of Tetris

August 24, 2026

LATEST NEWS

Ecological Building Systems strengthens leadership team with two new appointments
November 10, 2026
Frameclad Launch Approved Installer Network
November 4, 2026
MMC Ireland National Conference Returns for 2027 with Inaugural Awards Ceremony
November 4, 2026
LSFA Introduces New Integrator Membership Category
November 3, 2026
LSFA Launch Designing for a Lower-Carbon Future Guide
October 28, 2026
Reds10 Group enters US market with majority acquisition of modular housing specialist MMY US
October 27, 2026
Building Learning: The 2027 Webinar Calendar Is Here
October 27, 2026
No posts found

LATEST ISSUE

VIDEO VAULT

CLICK HERE TO READ THE LATEST ISSUE
  • NEWS ROOM
  • SUPPLIER DIRECTORY
  • EVENTS
  • OFFSITE INFORMATION
  • ABOUT US
  • PRIVACY
  • HUB OPPORTUNITIES
  • OFFSITE MAGAZINE
  • BACK ISSUES
  • SUPPLEMENTS
  • ADVERTISE
  • SUBSCRIPTION

SIGN UP FOR OUR

LATEST NEWSLETTER

SUBSCRIBE TO OUR

OFFSITE MAGAZINE

Get in touch

  • T: 01743 290001
  • E: [email protected]

© OFFSITE HUB 2026 - All Rights Reserved