Linkedin-in X-twitter Instagram
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms

NEWS

  • 2 October, 2026

Ergodek® – A New Era of Safe, Efficient and Innovative Metal Deck Fastening

Earlier this year, SFS Group Fastening Technology unveiled ErgoDek®, an ergonomic fastening solution engineered to transform metal deck overlap installation.

Bringing together a simple design, productivity boosting performance, and a strong focus on worker wellbeing, ErgoDek® marks a significant step forward for roofing and cladding contractors seeking safe, fast, and consistent installation tools. Purpose-built for metal deck overlap applications, the new ErgoDek® system integrates seamlessly with industry standard cordless screwdrivers and features a magazine mounted fastener system that minimises fatigue, improves fastening quality, and enables consistent fastener installation. ErgoDek® is available in three variants:

• CF20 ErgoDek D – Compatible with DeWalt DCF622®
• CF20 ErgoDek H – Compatible with Hilti ST1800 A22® and ST2000 22®
• CF20- ErgoDek-F – Compatible with FEIN ASCS 18-6.3®

Prioritising worker safety

Construction professionals often engage in repetitive and physically demanding fastening operations, highlighting the importance of ergonomic solutions. ErgoDek® is designed for use in a standing position together with adjustable handles, supporting a healthier posture and minimising bending. Its lightweight design and consistent fastening pressure help reduce the risk of errors and strain-related injuries, especially when combined with adjustable handles and the fasteners’ spin‑free zone.

Improved productivity

As fast track construction schedules become the norm, contractors need tools that allow teams to work more efficiently without sacrificing quality. ErgoDek®’s magazineassisted fastening system enables faster, more consistent fixing which minimises the need to revisit jobs, and the reduced strain on the operator ensures higher productivity. In addition, the cordless ErgoDek® reduces trip injuries.

Designed specifically for engineered design

ErgoDek® is suitable for a wide range of deck profiles and can secure into a deck thickness of 2x 1.25mm. ErgoDek® is a welcome addition to the SFS metal deck offering. The tool is compatible with the SL2-4,8 and CDM-4,8 fixing. Both fasteners have a spin free zone to prevent overdriving. The presence of the Fast-Tip on the CDM-4,8 provides an even faster install speed and reduces swarf in the drilling process. Additionally, SFS has a comprehensive main fix range for metal deck fasteners, satisfying all the requirements for metal deck jobs.

ErgoDek® is now available through the SFS product ordering system. Contractors can request a live demo by completing the form on the SFS website:
https://uk.sfs.com/systems/ergodek while the demo video is available on the SFS YouTube channel. Find out more by calling 0330 0555888 or visit: https://uk.sfs.com

Read full article here.

Views: 0

To supply a story email [email protected]

SHARE

RELATED TOPICS

NEWS YOU MIGHT BE INTERESTED IN…

The new CPD covers fire rated wall breather membranes used within external façade systems and air and vapour control layers

New CPD on Fire Rated Membranes for Building Safety

October 9, 2026

Euroform’s Latest Structural Floor Panel

September 2, 2026

MEP: Hidden in Plain Sight

August 27, 2026

The Vital Role of Insulation in MMC

August 27, 2026

MVHR Installation Doesn’t Have to Be a Game of Tetris

August 24, 2026

Enhancing 3D Volumetric Modular Design

August 6, 2026

LATEST NEWS

LSFA Launch Designing for a Lower-Carbon Future Guide
October 28, 2026
Building Learning: The 2027 Webinar Calendar Is Here
October 27, 2026
United Infrastructure joins BEAMA to support delivery of the Electricity Networks Sector Growth Plan
October 22, 2026
The secret to a successful supplier partnership? Trust.
October 21, 2026
Wyatt Homes strengthens senior construction team with two key appointments
October 20, 2026
Phil Parry joins Eurocell as profiles Commercial Director
October 19, 2026
Phil Parry joins Eurocell as profiles Commercial Director
October 19, 2026
No posts found

LATEST ISSUE

VIDEO VAULT

CLICK HERE TO READ THE LATEST ISSUE
  • NEWS ROOM
  • SUPPLIER DIRECTORY
  • EVENTS
  • OFFSITE INFORMATION
  • ABOUT US
  • PRIVACY
  • HUB OPPORTUNITIES
  • OFFSITE MAGAZINE
  • BACK ISSUES
  • SUPPLEMENTS
  • ADVERTISE
  • SUBSCRIPTION

SIGN UP FOR OUR

LATEST NEWSLETTER

SUBSCRIBE TO OUR

OFFSITE MAGAZINE

Get in touch

  • T: 01743 290001
  • E: [email protected]

© OFFSITE HUB 2026 - All Rights Reserved