Linkedin-in X-twitter Instagram
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Conferences & Exhibitions
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Conferences & Exhibitions
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms

NEWS

  • 14 May, 2025

Factory Open Day Showcases Innovation

Frameclad recently opened its doors to visitors and provided an exclusive opportunity to tour its facilities in Kingswinford to better understand offsite manufacture and one of the UK’s leading light steel frame providers.

 

Operating from two adjacent high-tech manufacturing factories with a combined area of 50,000sq ft of factory and office space — including a dedicated 24,000sq ft framing facility — Frameclad held an ‘open day’ to host a wide range of construction professionals. Attendees included architects, structural engineers, contractors, and local authority regeneration teams. The event showcased how Frameclad is not only delivering cutting-edge light steel solutions but also earning praise for exceptional quality and unrivalled customer service.

 

Frameclad has grown quickly since joint Managing Directors, Nicholas Teagle and Martin Jamieson, acquired the company from founder Mark Munns back in 2022. Substantial investment in cold roll-forming machinery – now seven machines – supported by customised Tekla software, produces both loadbearing and non-loadbearing light steel framing systems with huge interest in its Lightweight Engineered Adjustable Frame (LEAF) system.

Visitors were shown around both the assembly and manufacturing sides of the factory by Operations Director, Paul Stefanovic, who outlined the steps taken to produce its infill solutions and complex loadbearing systems with the capability to go up to nine storeys. “The flexibility and type of profile – angles and ‘Zs’ – that we can produce, and supply is exceptional,” said Paul. “It means that we can deliver a much more flexible and better-quality product. In keeping with offsite manufacture generally, our ethos is to capture mistakes inside the factory rather than outside the building.”

Of huge interest was the LEAF system – something described as ‘simple but revolutionary in application’. Essentially the four-axis adjustable light steel frame infill system can be extended and aligned in all directions to overcome the challenges associated with mainframe dimensional discrepancies. The surrounding structure in which a frame is placed is not always aligned as intended, and it is important for frames to be as adaptable as possible to ‘fill’ the void.

LEAF is the result of the total Frameclad team – designers, engineers, manufacturers and technical experts – coming together to create a system that overcomes an issue that is frequently experienced once a light steel frame infill system arrives on-site. “What sets LEAF infill panels apart is that the system can be adjusted on-site in all directions with total ease,” said Nik Teagle, Joint Managing Director for Frameclad. “From ‘top to bottom and side to side’ without the use of any specialist tools, cutting or welding equipment. When the aperture is totally ‘infilled’ from ceiling to floor and wall to wall, the innovated light steel mechanism is just locked into place. Safeguarding our ‘fit first time’ ethos, LEAF offers installers the flexibility to compensate for dimensional issues. Ensuring that the aperture is totally infilled, improves airtightness within the building envelope to enhance thermal performance and help achieve net zero goals.”

LEAF is expected to have huge benefits for the retrofit sector where existing structures can be reconfigured, and an adjustable frame system will help reduce costs, waste and the time taken on changing walls or room layouts. With zero waste in the manufacturing process and no cutting or welding on-site, the LEAF system has a predicted design life of 250 years in a warm frame environment.

With a 14 strong in-house design and engineering team that can provide cost estimates within 10 days and detailed designs within one week, customer service has been central to Frameclad’s on-going success. “We offer all sorts of site support as a manufacturer,” said Dale Joy, Frameclad’s Regional Specification Manager for the North. “We don’t just send our products to site and leave. We have gone to client’s offices and done presentations to their site team – a month before their start date – so they can start coming to terms with everything. We can provide site reports, work with the installers and do toolbox talks.  We want to make sure that before anyone picks up a tool, they’re fully up to speed, can read the drawings correctly and we answer any questions.”

“We’re working more and more with main contractors and we’re finding more are approaching us much earlier in the process. Early engagement is the key – the earlier the better – so we can iron out any problems. We are a very agile organisation, which is quite unusual in today’s marketplace and that is a key message we are getting across today.”

Backed by BOPAS accreditation, NHBC, Steel Construction Institute, Infill and CE certification, Frameclad has also invested in a growing suite of fire test and performance data to offer assurances that the system is robust and adheres to the new pressures created by the Future Homes Standard and Building Safety Act, with its golden thread of information and Gateway stages to ensure long-term reliability and structural integrity.

“We were delighted to invite the many industry professionals and local authority teams to see how our light steel frames are transforming the construction landscape,” added Nik Teagle. “Our systems are not only fast to install but also meet the highest safety and environmental standards, offering a durable and high-quality solution for modern building needs.”

For more information on how Frameclad can transform your project, you can visit the upgraded and freshly relaunched for April 2025 website: www.frameclad.com

Post Views: 2

To supply a story email [email protected]

SHARE

RELATED TOPICS

NEWS YOU MIGHT BE INTERESTED IN…

Inside Polypipe Building Services’ Aylesford Factory

August 7, 2026

Enhancing 3D Volumetric Modular Design

August 6, 2026

Fire Safety and Membrane Specifications: why performance matters

June 8, 2026

Closing the Knowledge Gap – Detailed testing of party wall/SFS wall junctions

June 3, 2026

Zehnder launches EVO for seamless MVHR install in tight spaces

April 29, 2026

The Importance Of Early Engagement

April 2, 2026

LATEST NEWS

Explore Offsite 2026 Speaker Programme Now Live
August 21, 2026
Wernick Hire launches RestPod to tackle workforce accommodation challenges on remote projects
August 20, 2026
Understanding How Frameworks Operate
August 19, 2026
MMC Specialist Mansell Building Solutions Prepares for Administration
August 19, 2026
The Cost-Effective Route to Net Zero
August 18, 2026
No posts found

LATEST ISSUE

VIDEO VAULT

CLICK HERE TO READ THE LATEST ISSUE
  • NEWS ROOM
  • SUPPLIER DIRECTORY
  • EVENTS
  • OFFSITE INFORMATION
  • ABOUT US
  • PRIVACY
  • HUB OPPORTUNITIES
  • OFFSITE MAGAZINE
  • BACK ISSUES
  • SUPPLEMENTS
  • ADVERTISE
  • SUBSCRIPTION

SIGN UP FOR OUR

LATEST NEWSLETTER

SUBSCRIBE TO OUR

OFFSITE MAGAZINE

Get in touch

  • T: 01743 290001
  • E: [email protected]

© OFFSITE HUB 2026 - All Rights Reserved