Linkedin-in X-twitter Instagram
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms

PROJECTS

Bowland Meadow – Ultrapanel

SECTOR

Residential

CONTRACTOR

Ultrapanel

TECHNOLOGY

Components

LOCATION

Preston

bowlandmeadowroof
ultrapanel

Project Overview

Barratt Homes had been closely involved in the development of the Ultrapanel system and are now rolling it out on live sites such as Bowland Meadow.

The Ultrapanel ‘room in the roof’ and spandrel wall solution was used on the Kingsville house type – a three-storey terraced home.

Fully Accredited – The Ultrapanel ‘room in the roof’ system is BBA and NHBC accredited for total peace of mind and future proofed to meet new legislation requirements.

Total Design Flexibility – The Ultrapanel system allows for windows (and staircases) to be placed virtually anywhere in a house design, which floods the space with huge amounts of natural light. On this house the Ultrapanel roof was able to replicate the existing design without any changes. Although in the future to take full advantage of the system, the design could include a valuted ceiling for example.

Rapid Installation – On this build, each plot was watertight within a day, saving a huge amount of time compared to a traditional roof build. No crane is needed, thanks to its lightweight nature which eliminates the complexities of having a crane on site, along with reducing H&S risks due to heavy lifting at height.

Site friendly – Thanks to an established, reliable and responsive supply chain, each Kingsville roof was delivered to site in kit form within 2 weeks of call-off, meaning no delays on site, and an acceleration of the build schedule.

For more information about this project and Ultrapanel technology, visit https://www.youtube.com/watch?v=jioYLxVnZas

SHARE

PROJECTS YOU MIGHT BE INTERESTED IN…

Intrastack Ennerdale Avenue

October 7, 2024

British Offsite Abbey Quay, Barking, Weston Homes

October 7, 2024

Langley Square, Mill Pond, Dartford

September 11, 2024

LATEST NEWS

Cross Europe Challenges

September 17, 2026

Algeco Announce Head of Quality UK

September 17, 2026
Discussion surrounded the role of the architect as part of the industrialised construction process

Architecture’s Manufacturing-led Future

September 16, 2026

Swarm Robots for Modular Build Trial

September 16, 2026

Portakabin Delivers New MIC in North Yorkshire

September 15, 2026

CLICK HERE TO READ THE LATEST ISSUE

  • NEWS ROOM
  • SUPPLIER DIRECTORY
  • EVENTS
  • OFFSITE INFORMATION
  • ABOUT US
  • PRIVACY
  • HUB OPPORTUNITIES
  • OFFSITE MAGAZINE
  • BACK ISSUES
  • SUPPLEMENTS
  • ADVERTISE
  • SUBSCRIPTION

SIGN UP FOR OUR

LATEST NEWSLETTER

SUBSCRIBE TO OUR

OFFSITE MAGAZINE

Get in touch

  • T: 01743 290001
  • E: [email protected]

© OFFSITE HUB 2026 - All Rights Reserved