Linkedin-in X-twitter Instagram
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Conferences & Exhibitions
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Conferences & Exhibitions
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms

PROJECTS

Timebridge Community Centre – McAvoy

SECTOR

Retail, Leisure

CONTRACTOR

McAvoy

TECHNOLOGY

Cladding

LOCATION

Stevenage

img_1340
timebridge
timebridge2
timebridge3

Project Overview:

This 2-storey purpose-built facility is an integral part of Croydon Council’s extensive regeneration programme for New Addington, one of the region’s most deprived neighbourhoods. Timebridge Centre is a central community hub offering access to education, health, career, and social support. Replacing the former Fieldway Family  Centre, Timebridge Community Centre includes a nursery and community café, food bank, youth, and family centre as well as a number of variously sized spaces to hire.

This 161,000 sqft £5.3m community hub required extensive Stakeholder engagement at an early stage to ensure all community requirements and aspirations could be met. This process enabled us to properly understand the many complex needs and potential requirements of groups and event uses within a social economically deprived area. The building was designed as a hybrid construction with a traditional steel frame for the double-height hall/atrium flanked either side by modular units. The 36 modules were craned into place onsite came with fixtures and fittings already in place including internal walls and plastering, doors, windows and ironmongery, plumbing, electrics, and joinery pre-installed prior to their arrival on site.

This approach significantly reduced the programme time and cost whilst ensuring a high level of quality control. Timebridge offers both spatial efficiencies whilst being designed to meet the specific functions of the multi-user groups. A central ‘Hub Space’ and double-height atrium helps to bind all the separate components of this building together. All wayfinding through the building flows through this central space, with an open bridge and stair designed to be visible from the central reception. Vibrant colours have been used to signify the various activity spaces and at its centre, a community cafe and seating area opens out into a courtyard encouraging natural interaction between different building users.

Designed to be secure and robust yet open and inviting to the local community it serves, light grey brickwork combines with contrasting charcoal aluminium windows, doors, and trims. Gold metal cladding is used as a statement feature wrapping around the 1st floor of the hall space giving a highly contemporary and quality finish which results in a building which belies the modular structure beneath its skin. The integrated landscaping scheme provides the setting for the building in what was once a backdrop of bland open space. Stone gabion retaining walls combined with low maintenance planting and a mix of pathways, grass areas and soft play surfaces provide both private and public activity spaces.

The building has achieved BREEAM Excellent using natural ventilation, high levels of insulation, low energy lighting, solar photovoltaic panels on the roof and improved biodiversity. Virtual Reality walkthroughs with the end-users and client assisted in the design development and interior design helping visualise both the internal and external spaces. Although faced with a number of logistical challenges, McAvoy worked closely with Croydon Council to overcome them together. Despite Covid challenges we managed to keep the site open throughout lockdown and delivered the project on time.

SHARE

PROJECTS YOU MIGHT BE INTERESTED IN…

Intrastack Ennerdale Avenue

October 7, 2024

British Offsite Abbey Quay, Barking, Weston Homes

October 7, 2024

Langley Square, Mill Pond, Dartford

September 11, 2024

LATEST NEWS

Wernick Hire launches RestPod to tackle workforce accommodation challenges on remote projects

August 20, 2026

Understanding How Frameworks Operate

August 19, 2026

MMC Specialist Mansell Building Solutions Prepares for Administration

August 19, 2026

The Cost-Effective Route to Net Zero

August 18, 2026

Reimagined renting arrived in Kent with launch of Orchard mill by Home by Way of Life

August 17, 2026

CLICK HERE TO READ THE LATEST ISSUE

  • NEWS ROOM
  • SUPPLIER DIRECTORY
  • EVENTS
  • OFFSITE INFORMATION
  • ABOUT US
  • PRIVACY
  • HUB OPPORTUNITIES
  • OFFSITE MAGAZINE
  • BACK ISSUES
  • SUPPLEMENTS
  • ADVERTISE
  • SUBSCRIPTION

SIGN UP FOR OUR

LATEST NEWSLETTER

SUBSCRIBE TO OUR

OFFSITE MAGAZINE

Get in touch

  • T: 01743 290001
  • E: [email protected]

© OFFSITE HUB 2026 - All Rights Reserved