Linkedin-in X-twitter Instagram
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Conferences & Exhibitions
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Conferences & Exhibitions
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms

NEWS

  • 23 September, 2022

Donaldson Timber Systems Builds on BOPAS Accreditation with BOPAS Plus

Leading UK timber frame manufacturer, Donaldson Timber Systems (DTS) has become one of the first manufacturers to achieve Buildoffsite Property Assurance Scheme Plus (BOPAS plus), a durability assessment for advanced, offsite build systems.

Building on the original BOPAS scheme, BOPAS plus has been developed to introduce a greater focus on the preparedness of the offsite sector to drive digitisation and collaboration in the construction industry. 

Donaldson Timber Systems is one of only three businesses in the UK to hold the new accreditation. The DTS Sigma® II system, was one of the first offsite build systems originally to be accredited by BOPAS in 2013.

BOPAS is the industry benchmark to demonstrate quality and durability to funders, lenders, valuers and purchasers, giving them the confidence that homes built using offsite construction will have a life of at least 60 years.

The accreditation process involves a rigorous assessment, including a two-stage review; a detailed interview with Lloyds Register and a full day audit, where the business is required to provide tangible evidence on the plans in place to deliver on its five-year plan.

Rod Allan, Managing Director, Donaldson Timber Systems said: "BOPAS plus is a fantastic achievement for the business, and will help to ensure that we have a clear differentiator when promoting our Sigma® II build system to the market.

"An increased use of our Sigma® II system will reduce the energy required by customers to run their homes, as well as very low embodied carbon from the construction of the home. BOPAS plus will help to provide our clients and the industry with the confidence that our system has been thoroughly assessed and is highly durable."

Andrew Donaldson, CEO of the Donaldson Group added: "We expect to see a much greater uptake in modern methods of construction in the coming years and anticipate the demand for offsite construction will continue to increase to help address the housing crisis and the drive for net zero. This accreditation further demonstrates the integrity of the offsite method and its longevity. It’s not just a positive for Donaldson Timber Systems and the wider Donaldson Group, but for the offsite sector as a whole."

BOPAS is recognised by the principal mortgage lenders as providing the necessary assurance underpinned by a warranty provision, that the property will be readily mortgageable for at least 60 years.

Source: www.donaldsontimbersystems.com

Post Views: 123

To supply a story email [email protected]

SHARE

RELATED TOPICS

NEWS YOU MIGHT BE INTERESTED IN…

Explore Offsite 2026 Speaker Programme Now Live

August 21, 2026

Wernick Hire launches RestPod to tackle workforce accommodation challenges on remote projects

August 20, 2026

Understanding How Frameworks Operate

August 19, 2026

MMC Specialist Mansell Building Solutions Prepares for Administration

August 19, 2026

The Cost-Effective Route to Net Zero

August 18, 2026

Reimagined renting arrived in Kent with launch of Orchard mill by Home by Way of Life

August 17, 2026

LATEST NEWS

Explore Offsite 2026 Speaker Programme Now Live
August 21, 2026
Wernick Hire launches RestPod to tackle workforce accommodation challenges on remote projects
August 20, 2026
Understanding How Frameworks Operate
August 19, 2026
MMC Specialist Mansell Building Solutions Prepares for Administration
August 19, 2026
The Cost-Effective Route to Net Zero
August 18, 2026
No posts found

LATEST ISSUE

VIDEO VAULT

CLICK HERE TO READ THE LATEST ISSUE
  • NEWS ROOM
  • SUPPLIER DIRECTORY
  • EVENTS
  • OFFSITE INFORMATION
  • ABOUT US
  • PRIVACY
  • HUB OPPORTUNITIES
  • OFFSITE MAGAZINE
  • BACK ISSUES
  • SUPPLEMENTS
  • ADVERTISE
  • SUBSCRIPTION

SIGN UP FOR OUR

LATEST NEWSLETTER

SUBSCRIBE TO OUR

OFFSITE MAGAZINE

Get in touch

  • T: 01743 290001
  • E: [email protected]

© OFFSITE HUB 2026 - All Rights Reserved