Oregon Timber Frame, a part of Barratt Redrow, has built on its expansion in Derby and Selkirk, achieving a record year in manufacturing timber frame kits for sustainable homes.
The housebuilder opened a new £45 million timber frame factory in the East Midlands and invested an additional £24 million to expand its existing facility in Selkirk, located in the Scottish borders, as part of its plan to scale up off-site construction.
As a result, the number of timber frame kits produced in 2024 has risen to almost 4,000, marking a 26% increase compared to the previous year. Oregon plans to further increase manufacturing across both sites in 2025, with over 5,500 homes anticipated to be built from timber frame kits.
In the long term, the housebuilder aims to construct around 9,000 of the 22,000 homes it expects to build annually using timber frame kits.
Barratt Redrow acquired Oregon, one of the largest timber frame manufacturers, in 2019 to support its strategy of increasing the number of homes built off-site. The developer’s growing use of Modern Methods of Construction (MMC) will help meet the 2025 Future Homes Standard, reduce carbon emissions, cut waste by around 30% and minimise disruption to local communities, while addressing the on-site skills shortage in the construction sector.
Peter Wade, joint managing director at Oregon, stated: “The significant investment by Barratt Redrow in new manufacturing facilities, jobs, and skills at Oregon has brought rewards for customers and the environment. We’ve been able to manufacture more homes in our state-of-the-art factories, which use sustainable timber, are precision-built, and most importantly, allow for a greater depth of insulation, making homes warmer and more cost-efficient to run.”
Peter Wade also added: “By increasing our use of modern methods of construction, Barratt Redrow continues to advance on the path to becoming net zero carbon.”
He further explained: “The timber frame system has evolved through decades of research and development. Each timber frame structure is designed by a timber designer and structural engineer, with the technique enhanced by computer engineering. Detailed 3D modelling allows us to test the structure within a computer program before laying foundations. Additionally, unlike traditional construction methods, timber frame homes can be built in just a couple of days, regardless of weather conditions, which is a significant advantage in the UK.”
Source: Show House








