Linkedin-in X-twitter Instagram
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Conferences & Exhibitions
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms
  • Home
  • News Room
    • Projects
  • Offsite Magazine
    • Latest Issue
    • Back Issues
    • Supplements
    • Advertise
    • Print Subscription
    • Digital Sign Up
  • Events
    • Conferences & Exhibitions
    • Explore Offsite Conference
    • Offsite Awards
    • Factory Tours
    • Roundtables
  • Offsite Info
    • About Offsite Hub
    • Offsite Technologies
    • Supplier Directory
    • Glossary of Terms

NEWS

  • 20 August, 2026

Wernick Hire launches RestPod to tackle workforce accommodation challenges on remote projects

Industry research suggests 44% of construction workers spend 2-3 hours per day travelling for work, while over 80% are not getting enough sleep. In addition, the Health and Safety Executive has repeatedly identified fatigue as a concern across safety-critical industries. To combat this, Wernick Hire has introduced RestPod; a premium, overnight accommodation option installed on site to help staff recover from early starts, night shifts and long hours. With a recent investment of £1.25 million expanding their existing range, RestPod can now support engineers, supervisors, commissioning teams and specialist contractors on remote construction and infrastructure projects.

Set apart from standard site accommodation, RestPod is more than a temporary building with beds. The self-contained RestPod cabins are designed with premium features, including ensuite shower rooms, integrated heating and LED lighting, USB charging points, and overhead storage. Accommodation options range from Solo or Twin bed setups, to the larger Twin Luxe solution designed for longer stays and enhanced comfort on site. In terms of construction, RestPod is built for demanding environments with a robust steel structure and fully insulated walls, ceilings and floors.

While some sites require a full modular accommodation setup, RestPod is designed for jobs that simply need engineers based on site, supervisors available for changing shifts, and accommodation that can be deployed quickly.  Where changing project conditions need to be considered, RestPod can also be scaled to your project and positioned flexibly around live site environments.

Wernick Hire recently provided 6 RestPod units to BAM Nuttall’s bridge-stretching works across the River Deben, allowing workers to stay on-site safely and comfortably in a compact, self-contained welfare solution. Carl Morson from BAM Nuttall praised “The units were in great shape and had everything our team needed, clean showers, plenty of sockets, and a comfortable setup overall. The service from Wernick was fast and polite, and everything was turned around in a short space of time. I’d be happy to recommend them.”

If your project requires wider site infrastructure, the Wernick Group can also provide welfare, offices, toilets, temporary power and more.

Post Views: 1

To supply a story email [email protected]

SHARE

RELATED TOPICS

NEWS YOU MIGHT BE INTERESTED IN…

Explore Offsite 2026 Speaker Programme Now Live

August 21, 2026

Understanding How Frameworks Operate

August 19, 2026

MMC Specialist Mansell Building Solutions Prepares for Administration

August 19, 2026

The Cost-Effective Route to Net Zero

August 18, 2026

Reimagined renting arrived in Kent with launch of Orchard mill by Home by Way of Life

August 17, 2026

Supporting Safe Timber Growth

August 14, 2026

LATEST NEWS

Explore Offsite 2026 Speaker Programme Now Live
August 21, 2026
Wernick Hire launches RestPod to tackle workforce accommodation challenges on remote projects
August 20, 2026
Understanding How Frameworks Operate
August 19, 2026
MMC Specialist Mansell Building Solutions Prepares for Administration
August 19, 2026
The Cost-Effective Route to Net Zero
August 18, 2026
No posts found

LATEST ISSUE

VIDEO VAULT

CLICK HERE TO READ THE LATEST ISSUE
  • NEWS ROOM
  • SUPPLIER DIRECTORY
  • EVENTS
  • OFFSITE INFORMATION
  • ABOUT US
  • PRIVACY
  • HUB OPPORTUNITIES
  • OFFSITE MAGAZINE
  • BACK ISSUES
  • SUPPLEMENTS
  • ADVERTISE
  • SUBSCRIPTION

SIGN UP FOR OUR

LATEST NEWSLETTER

SUBSCRIBE TO OUR

OFFSITE MAGAZINE

Get in touch

  • T: 01743 290001
  • E: [email protected]

© OFFSITE HUB 2026 - All Rights Reserved