Project - Sustainable Self Build Dwelling
Sector - Commercial
Technology - Timber
Company - SIP Build UK
Project Overview
Hampsthwaite is renowned for its listed buildings and
distinctive style, with gritstone being the dominant building material
prominently used. Whilst the client wanted to ensure this style was
included, a modern twist was also desired, not just with the building
system and fabric, but also the external finish. A mix of Gritstone and
zinc to ground, first floor elevations and roof delivered a stunning
contrast to this beautiful home set within its spacious countryside
acreage.
Internally the Gritstone continued to certain elevations,
contrasting against the immaculate, modern open plan space and vaulted
ceilings the SIPs system provided. The additional structure the SIPs
system required, a mix of thin, strong steelwork and architectural
Glulam. Combined the steelwork was easily hidden in floor and wall zones
to ensure clean internal lines for the large open plan areas whilst the
Glulam provided stunning features in keeping with the more traditional
builds within the Hampsthwaite area.
SIP Build UK were appointed to design, engineer and install on site
the complete SIPs system, including all internal walls, floors and
additional structures such as steels and glulam. All cranage and lifting
also included for the duration of the time SBUK were on site to reduce
variables and risk on site for the client and overall build program.
Giving the client just one point of contact for the complete install of
the system, SBUK delivered the dwelling and stable block in just 4 weeks
– 1 week ahead of schedule. With the client project managing the build,
the use of the Kingspan TEK SIPs system, combined with the appointment
of SIP Build UK, massively reduced risk, variables and potential issues
on site.
The SIPs system gave a predictable program time for the
superstructure so that follow on trades could be organised exactly when
required. The SIPs system wrapped in its breather membrane also took the
external finishes off the critical path so work could be completed
internally and externally by follow on trades at the same time, again
reducing the overall build time of the project. The aesthetic finish has
produced a truly stunning home, the SIPs providing a real wow factor to
the open vaulted sections of the build whilst minimising the overall
construction depth to both the roof and walls ensuring the internal
living space was maximised within this prestigious plot.
The overall construction depth in the walls reduced by over 175mm
in comparison to traditional methods. 4 week build time on site for the
complete SIPs structures significantly reduced the impact on the local
community and the immediate environment of the build. Combined with the
sustainable credentials of the system, SIPs ticked every box.