NOW LIVE!
Connecting you directly with your supply chain!
Explore the Supplier Directory here!
Project - Leeds Student Accommodation
Sector - Education
Architect - Intelligent Steel
Technology - Steel
Intelligent Steel partnered with Ashcourt Contracts to design, manufacture and install 6000m2 of load-bearing light steel framing to create 187 units of student accommodation over 9-storeys in the centre of Leeds. Off-site manufactured light steel wall panels (with factory installed weather defence board) and floor cassettes (with factory installed steel decking) were erected on site to create the building in just 16-weeks - 14-weeks ahead of the original 30-week target installation programme. The project demonstrated that by employing modern methods of construction alongside the incredible material properties of light gauge steel, speed of construction could be vastly improved without sacrifice to health and safety or quality.
Welcome to the Offsite Hub Podcast where we discuss the latest trends and advances in offsite construction technology.
For the latest exclusive offsite information and discussions straight from the leaders of the industry MORE >